Got a 11.7m run with a 1 in 10 slope. Looking at doing vertical boards with minimal gaps. Putting new posts in. Neighbour has feather edge board stepped.
Not sure what is best looking to do. Stepped or slopped. And which is easier? Done a Sketchup for the stepped style.
Other option is to go progressively down in small steps per board, but not sure how this would look?
Thoughts based on experience?
Not sure what is best looking to do. Stepped or slopped. And which is easier? Done a Sketchup for the stepped style.
Other option is to go progressively down in small steps per board, but not sure how this would look?
Thoughts based on experience?