Hi folks,
After abit of advice. At the moment our small toilet has surface boxed water feeds to toilet, basin and CH. All the other rooms have channeled ducts which are topped with a floor board which is recessed.
I'd like to replicate that in the toilet as the boxing in looks unsightly.
The floor is bitumen topped (around 15/20 mm) under concrete. Just to be clear, Im not looking to sink the pipes into screed.
I understand the bitumen is acting as a DPM, so would grinding and digging out the channel, DPM and shuttering in with concrete/screed sound right?
The channel will become quite crowded for 500mms with the cold water feed to the toilet, hot and cold to basin and flow/return of CH so any tips or advice would be massively appreciated.
Cheers
After abit of advice. At the moment our small toilet has surface boxed water feeds to toilet, basin and CH. All the other rooms have channeled ducts which are topped with a floor board which is recessed.
I'd like to replicate that in the toilet as the boxing in looks unsightly.
The floor is bitumen topped (around 15/20 mm) under concrete. Just to be clear, Im not looking to sink the pipes into screed.
I understand the bitumen is acting as a DPM, so would grinding and digging out the channel, DPM and shuttering in with concrete/screed sound right?
The channel will become quite crowded for 500mms with the cold water feed to the toilet, hot and cold to basin and flow/return of CH so any tips or advice would be massively appreciated.
Cheers