So I read up on Smart meters and it would seem they do two things which AMR meters did not do, the Smart meter or AMI (advanced metering infrastructure) can be also used for pre-payment as it has two way coms, and two it has power outage notification, but the installer said it has not internal battery, so it can't notify in the case of a power failure.
Not sure if lack of information being sent is used? But all a bit silly as again refused to fit it, says the consumer units must be moved first, I can see his point, but why was it not said with first visit?
Now waiting for solar panel people to move the CU they fitted.