hi ,
iv come to a problem that im not sure how to get round .
i have an existing stack close to where i took a pipe out of the wall for my new toilet but as the existing stack has no play up or down , how do i get my new joint in to recieve the new pipe
thoughts plz , im up to the stage now that i need to cut lol and dont want to end up with a prob i cant fix tonight
iv come to a problem that im not sure how to get round .
i have an existing stack close to where i took a pipe out of the wall for my new toilet but as the existing stack has no play up or down , how do i get my new joint in to recieve the new pipe
thoughts plz , im up to the stage now that i need to cut lol and dont want to end up with a prob i cant fix tonight