- Joined
- 27 Jan 2008
- Messages
- 23,728
- Reaction score
- 2,675
- Location
- Llanfair Caereinion, Nr Welshpool
- Country
I have had a survey done, and a firm is to install solar panels and battery, they should work in three stages, first they supply existing load, then they charge the battery, then they heat the immersion heater, and only if any spare after that should it export the power, so unlikely much power will be exported, however they tell me the supplier will use the reading from the meter being installed by the solar panel installer, to credit me with any export, and they their meters are not calibrated, this seems odd, I had expected to be told my meter must be changed, so it can measure import and export where the existing meter as far as I am aware would log both import and export as import.
Have I got some thing wrong?
Have I got some thing wrong?