Im building a cavity wall garage, required Planning Permission but doesn't fall under building regs.
Im building it with both inner and outer leaf of cavity wall in dense concrete block (440x215x100).
I have a steel door in a steel frame 1780w x 2075h that will sit on the concrete slab and open outwards.
I'm only up to 4 rows of clockwork at the moment but thinking ahead to the lintel above the door.
9 rows of block will come to a nominal 2025mm, 50mm lower than the top of the door frame so too low for the lintel to be installed.
10 rows of block will come to 2250mm, leaving a gap of 175mm between top of door frame and and the bottom of the lintel.
So, one option would be 9 rows of block and 1 row on inner and outer leaf of 65mm engineering brick, taking the height to 2100mm, leaving only a 25mm gap between frame and lintel to be filled.
Is this extra row of brick around the whole garage perimeter my only option?
Im building it with both inner and outer leaf of cavity wall in dense concrete block (440x215x100).
I have a steel door in a steel frame 1780w x 2075h that will sit on the concrete slab and open outwards.
I'm only up to 4 rows of clockwork at the moment but thinking ahead to the lintel above the door.
9 rows of block will come to a nominal 2025mm, 50mm lower than the top of the door frame so too low for the lintel to be installed.
10 rows of block will come to 2250mm, leaving a gap of 175mm between top of door frame and and the bottom of the lintel.
So, one option would be 9 rows of block and 1 row on inner and outer leaf of 65mm engineering brick, taking the height to 2100mm, leaving only a 25mm gap between frame and lintel to be filled.
Is this extra row of brick around the whole garage perimeter my only option?