I have just taken the grass and dug it back to mud and have 16 450x460 riven stone pavers to lay in 2 rows of 8 with about 200-300 mm gap between which will have membrane and blue slate in between. Now trying to do this on a budget. My plan is to lay the slabs down where they will go and cut square out of mud below maybe 2 inch then fill with mot1 a stamp with a builders hammer. Then thinking a wet mix on top 30-40mm to set the slabs on won’t be walked on much. Does this sound ok.
Quite wet still on the mud so may cause issues should I do a dry mix instead ? 5/1
I have just taken the grass and dug it back to mud and have 16 450x460 riven stone pavers to lay in 2 rows of 8 with about 200-300 mm gap between which will have membrane and blue slate in between. Now trying to do this on a budget. My plan is to lay the slabs down where they will go and cut square out of mud below maybe 2 inch then fill with mot1 a stamp with a builders hammer. Then thinking a wet mix on top 30-40mm to set the slabs on won’t be walked on much. Does this sound ok.
Quite wet still on the mud so may cause issues should I do a dry mix instead ? 5/1