- Joined
- 10 Jan 2018
- Messages
- 60
- Reaction score
- 0
- Country
Hi all I’m having new extension to rear. kitchen currently open plan with living area. Moving the kitchen to rear the property my stop tap is currently under the sink in existing kitchen where it will be for a while this weekend i am hoping to poor the floor slab to new extension. But tonight I started thinking about the stop tap.. how do I move the stop tap into the new extension when the kitchen is ready to be moved can The plumber basically put the pipes in the wall threw ceiling to new kitchen etc or do I have to have some form ducting from current place to new place.. my other issue is my current house we believe is raft foundation so it’s only roughly 300mm below ffl so won’t be able to get the duct to recommend 750/900mm I was gunna run duct at 300 break hole into existing cavity and find it when the kitchen is going to be moved to rear.. any ideas