I have a plastic pipe that I put in some time ago to cconnect a new water main to my property (we are currently on lead). I spoke to the water board today and they are telling me that since the pipe has been in for about 2 years, unconnected, then I need to have it 'super chloriniated' or replaced. They didnt tell me this when I filled all of the forms in for the original inspection (although they have lost all the paperwork and are going to have to reinspect). They alsoe said I will have to show them a certificate once it has been done.
Are we being told the right thing and how much should I expect it to cost?
Are we being told the right thing and how much should I expect it to cost?
