Anyone done this on the ground floor? Any suggestions for protection against the possibility of mice eating the plastic pipe?
I’m thinking, lift current floor, batten joists and lay insulation then ufh on joists to eventually be tiled but worried about mice getting to the pipes.
I’m thinking, lift current floor, batten joists and lay insulation then ufh on joists to eventually be tiled but worried about mice getting to the pipes.