System Boiler & Unvented Cylinder Install In Leeds - ASAP Start

Discussion in 'Plumbing and Central Heating' started by puthsardarade, 3 Mar 2016.

  1. puthsardarade

    puthsardarade

    Joined:
    21 Jun 2011
    Messages:
    7
    Thanks Received:
    0
    Location:
    Leeds
    Country:
    United Kingdom
    Hi,

    I have purchased the boiler Viessmann 200-W 35KW and I am quite happy to also buy the radiators, unvented cylinder and filter along with all other materials required.

    I am seeking a gas engineer with unvented installation licence that is available to start asap although I can wait up to around 2 weeks.

    My house is in Leeds LS17

    · Remove & decommission existing gravity heating system – Gas Boiler, Water Tanks, Existing Radiators and Cylinder.

    · Flush & Clean System.

    · Install Fernox TF1 Filter & Inhibitors or Adey MagnaClean Professional 22mm Filter).

    · Install Viessmann 200-W 35KW and Standard Flu in Loft.


    · Install Unvented Indirect Hot Water Cylinder 250L or 300L in Loft.


    · Install 15 Double Panel Radiators with TRV's & Lockshields (+ 3 more radiators would be chrome towel radiators).

    · Install Nest 3rd Generation to Heating and Hot Water.

    · Feeds for Washing Machine & Dryer in garage & for new en-suite – hot cold and waste and connect to existing soil stack.

    · All copper pipes, existing coppers can be retain where required, some existing pipes may need to be upgraded to 28mm as boiler is to be placed in the loft. Ensure minimum 22mm piping is in place throughout.

    I am also looking for 3 bathrooms and 1 toilet to be fitted afterwards.

    Anyone interested send me a private message please.


    Thanks
     
  2. Sponsored Links
  3. petit_pablo

    petit_pablo

    Joined:
    18 Nov 2007
    Messages:
    9,383
    Thanks Received:
    1,970
    Location:
    Lincolnshire
    Country:
    United Kingdom
    Dont all jump at once :ROFLMAO:
    Have you reinforced the loft to take the weight of that unvented cylinder?
    You say you can supply all materials, does that include consumables?
     
  4. puthsardarade

    puthsardarade

    Joined:
    21 Jun 2011
    Messages:
    7
    Thanks Received:
    0
    Location:
    Leeds
    Country:
    United Kingdom
    Platform already in place in loft taking the weight of existing gravity tank and platform will be able to take weight of an unvented cylinder - this has been checked.
    I can supply all the materials including consumables if I am provided with a list then I will ensure that this is done beforehand.

    Job is in Leeds.

    Just need a qualified gas engineer with G3 to contact me and quote me should anyone be interested
     
  5. Dan Robinson

    Dan Robinson

    Joined:
    1 Jul 2007
    Messages:
    56,034
    Thanks Received:
    9,420
    Location:
    Hertfordshire & London
    Country:
    United Kingdom
    Running all the way.
     
  6. hazetimesfive

    hazetimesfive

    Joined:
    1 Dec 2011
    Messages:
    2,996
    Thanks Received:
    328
    Location:
    Surrey
    Country:
    United Kingdom
    I don't do internet leeds.
     
    • Like Like x 2
  7. Dan Robinson

    Dan Robinson

    Joined:
    1 Jul 2007
    Messages:
    56,034
    Thanks Received:
    9,420
    Location:
    Hertfordshire & London
    Country:
    United Kingdom
    Boom boom :D
     
    • Thanks Thanks x 1
  8. shambolic

    shambolic

    Joined:
    25 Aug 2008
    Messages:
    5,754
    Thanks Received:
    2,855
    Country:
    United Kingdom
    ill start hopping just now see you in Leeds in a fortnight.
     
    • Like Like x 1
  9. fitting a nest to a v-200 what a waste!
     
    • Like Like x 1
  10. Sponsored Links
  11. Dan Robinson

    Dan Robinson

    Joined:
    1 Jul 2007
    Messages:
    56,034
    Thanks Received:
    9,420
    Location:
    Hertfordshire & London
    Country:
    United Kingdom
    And a TF1 :LOL:

    Boiler is twice the size needed too by the looks of things.

    Sounds like a great job :LOL:
     
  12. 18 rads, 15 of them doubles, me thinks someone is going to struggle getting heat to all them :ROFLMAO:
     
  13. simond

    simond

    Joined:
    26 Oct 2004
    Messages:
    5,232
    Thanks Received:
    465
    Location:
    Surrey
    Country:
    United Kingdom
    But what is your cheapest possible price?
     
  14. Dan Robinson

    Dan Robinson

    Joined:
    1 Jul 2007
    Messages:
    56,034
    Thanks Received:
    9,420
    Location:
    Hertfordshire & London
    Country:
    United Kingdom
    If you have to ask ;)
     
  15. Agile

    Agile

    Joined:
    26 Jun 2004
    Messages:
    64,039
    Thanks Received:
    4,595
    Location:
    London
    Country:
    United Kingdom
    Why do you want a 35 kW boler?

    Is it a 10 bedroom house?

    Tony
     
  16. Agile

    Agile

    Joined:
    26 Jun 2004
    Messages:
    64,039
    Thanks Received:
    4,595
    Location:
    London
    Country:
    United Kingdom
    Actually its not all that expensive according to my quick quote method I use for budgetary telephone quoting.

    Its only £2750 ! I rather expected it would be more!

    But it does not cover upgrading any gas pipes apart from the last 3m.

    Also assumes pipes to the rad locations are at the required spacing to!

    Tony
     
  17. FiremanT

    FiremanT

    Joined:
    16 Jan 2012
    Messages:
    9,494
    Thanks Received:
    1,898
    Location:
    Uk
    Country:
    United Kingdom
    I like the carrot:)
     