New bathroom which has just been dot & dab 12.5mm plaster board.
Had asked for the shower area to be tile baker board but plaster team weren't told by the builder so have now fully been boarded out.
I have marked up on the wall and told them not to skim the shower cubicle area now.
Do I take the plaster board down and put tile board up instead or just tank the plaster board ?
Only using ceramic 250x200 tiles.
The p/b full boards cover the place which will be tiled and half what has been skimmed so thinking it might not easy to cut them out ?
What do you think ?
Had asked for the shower area to be tile baker board but plaster team weren't told by the builder so have now fully been boarded out.
I have marked up on the wall and told them not to skim the shower cubicle area now.
Do I take the plaster board down and put tile board up instead or just tank the plaster board ?
Only using ceramic 250x200 tiles.
The p/b full boards cover the place which will be tiled and half what has been skimmed so thinking it might not easy to cut them out ?
What do you think ?