hi helpers, I am planning to re tile my shower cubicle and tile my plain brick/plastered walls in shower room
when i take off the tiles in cubicle will i need to re tank the walls ( if they were done in the first place ) and will i need to tank the plain walls which have been emulsioned with bathroom paint ? thanks P M
is this the best order to do ?
1. take out newish toilet and basin/ rad
2 remove shower tray
3 remove tiles in cubicle
4 remove floor tiles/ skirting board
5 install new shower tray
6 tile cubicle walls ( so family can use )
7 tile plain walls
8 tile floor
9 re install toilet/basin/rad
would it be best to tile down to the floor and leave skirting off ?
Thanks once again!!
when i take off the tiles in cubicle will i need to re tank the walls ( if they were done in the first place ) and will i need to tank the plain walls which have been emulsioned with bathroom paint ? thanks P M
is this the best order to do ?
1. take out newish toilet and basin/ rad
2 remove shower tray
3 remove tiles in cubicle
4 remove floor tiles/ skirting board
5 install new shower tray
6 tile cubicle walls ( so family can use )
7 tile plain walls
8 tile floor
9 re install toilet/basin/rad
would it be best to tile down to the floor and leave skirting off ?
Thanks once again!!