I'm fitting a wall mounted shower room sink to a stud wall.
Should I leave the copper exposed through the wall and then tile, before fitting exposed tap isolation valves?
Or should I fit valves first?
(Easier to pressure test pipework for leaks, but not so pretty?)
Any ideas on what sort of valve to use?
Should I leave the copper exposed through the wall and then tile, before fitting exposed tap isolation valves?
Or should I fit valves first?
(Easier to pressure test pipework for leaks, but not so pretty?)
Any ideas on what sort of valve to use?