Havwe stripped off tiles in shower room as the waterwas penetrating and causing a real mess.
The wall about 1m up from floor level are sodden. The walls just have bonding on them, no finishing plaster. Is this going to be a problem when re-tiling or would the walls need to be finished properly?
Advice needed please.
The wall about 1m up from floor level are sodden. The walls just have bonding on them, no finishing plaster. Is this going to be a problem when re-tiling or would the walls need to be finished properly?