Hi guys. I'm new, be gentle!
I currently doing a major referb on my house. Whole thing will need a re-wire (LABC aware & doing inspects for part P). Not at that stage yet but need to move my TN-S supply to an outside meter box. DNO have said I can either have have TN-S or TN-C-S (PME) supply – my call. Question is what to ask for and why? My initial thoughts is to go with PME but I have a large shed in the back garden and wondered if this would be a problem exporting the CPC, although I have no problem using 3-core 10.0mm² SWA to extend the equipotential zone or am I talking rot?
I currently doing a major referb on my house. Whole thing will need a re-wire (LABC aware & doing inspects for part P). Not at that stage yet but need to move my TN-S supply to an outside meter box. DNO have said I can either have have TN-S or TN-C-S (PME) supply – my call. Question is what to ask for and why? My initial thoughts is to go with PME but I have a large shed in the back garden and wondered if this would be a problem exporting the CPC, although I have no problem using 3-core 10.0mm² SWA to extend the equipotential zone or am I talking rot?