Hi,
I have tails coming out of the wall that were set for a 500mm towel rad. However I have had a 600mm rad delivered (an they are on a 6wk lead time!).
Is this a problem? Would we just put a 90-deg bend in each tail? What type of valve would then be fitted?
Thanks.