I'm putting a towel radiator on a new stud wall with concealed pipework behind.
I'll have to connect up the pipework to existing heating pipework before plasterboarding.
If I put the valves on beforehand I'll be left with large cut outs in the tiles, and the heavy vales hanging from the pipework not being supported by the rad.
How do most people get around this?
I'll have to connect up the pipework to existing heating pipework before plasterboarding.
If I put the valves on beforehand I'll be left with large cut outs in the tiles, and the heavy vales hanging from the pipework not being supported by the rad.