UHF new screed drying time

Joined
18 Feb 2015
Messages
99
Reaction score
1
Location
Sheffield
Country
United Kingdom
Hi everyone

Sorry reposted as posted in wrong section originally.

A friend has had a floor screeded over a wet UFH system. It is a sand/cement one.

The screeder said leave it of until the weekend but I've seen a month or so ?
I would have thought the warmth from it could crack it that soon?

So what is the ideal time that it should be left without the pipes turned on ?

The screed is 50mm
 
Sponsored Links
renishawphil, good evening.

Historically it is / was considered that 20.mm / month was a "drying time"

As for your friend, suggest leave the heating Off for as long as poss. then introduce heat as slowly as poss. lowest possible setting on the stat and only for short periods.

Ken
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top