Vapour control barrier

Joined
15 Apr 2005
Messages
25
Reaction score
0
Country
United Kingdom
I'm going to cover an insulated dormer wall with a 500g VCM; can anyone tell me (a) how its first fixed to the studs and (b) how you fix the plasterboard over it - presumably the screws/nails penetrate the vcm and thus breach it? Or is that just accepted?
 
Sponsored Links
a) stapled into wooden studs

b) nailed or screwed but screw is best

it needs taping around electrical sockets to keep the seal but the plasterboard fixings cannot be helped so dont worry about them
 
thanks MM - staples as in domestic stapler, or as in some sort of nail/tack? thanks for help
 
Sponsored Links

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top