Wall starters, education needed please.

Joined
2 Sep 2013
Messages
40
Reaction score
4
Location
Yorkshire
Country
United Kingdom
hi all,

I'm about to fill a cavity that's formed between a building and an extension.
I've chased out all the mortar and the starters are bent all over the place
The wall starters that are there have been screwed to the original building in only two places per strip and the leaves only go into the extension brick work a few times per starter. Same for both inner and outer leaf.

Is this normal?
Is there a standard practice for installing?
To what extent do starters have influence over movement and Would only having a couple of fixings per tie be in any way responsible for (not halting) the movement.
It seems unlikely to me that such small fixings could prevent that happening, but I can see how many of them would equal a considerable anchoring force.

Please educate away
 
Sponsored Links
normally about three fixings per starter length and then tabs about every 6 courses.
 
Thanks, that's a lot less than I thought but still probably more than is there.
 
Sponsored Links
These are more for up and down movement, and not to stop the extension pulling away if it wants to.
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top