Water damaged ceiling plaster idea

Today I put on SBR on the damaged part of the ceiling, and it was drying in about 20 minutes. I then put on the base coat using the Ready Mixed plaster. With the base coat, I put the joint tape, and then mesh tape on the hole and joins with the base coat, and left to dry.

The 1st base coat was roughly done, and tried to make as thick as possible 2-3 mm thickness. It seems to be drying ok.

Tomorrow I will put on the 2nd base coat to bring the level near to the existing plaster outer surface of the ceiling. If it is near enough, then I will put the finishing skim coat.

Just wondering, if SBR must be applied on each different coat on the top of the dried plaster before putting another coat on it.
If it must, then how much or little amount? Applying SBR with paint brush to the ceiling was tricky due to its dripping down.
 
Last edited:

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top