The front of my house is tile slung.
I'm looking to remove the tiles and battens.
Lay tyvek breathable membrane onto the block work.
Then batten with 45x75 treated timber
Insulate between battens with 75mm celotex then clad with western red cedar.
My question is will it condensate and do I need to allow for air flow.