probably this question has been asked before but in a nutshell which of the two system is better?
I have an eartblock connected to the incoming supply via a small green wire. The earthblock is connected to gas, water main and also goes to the main CU.
Ze on test certificate I was given reads 0.12 not that this means anything to me.
I have an eartblock connected to the incoming supply via a small green wire. The earthblock is connected to gas, water main and also goes to the main CU.
Ze on test certificate I was given reads 0.12 not that this means anything to me.