have a new bathroom now, old bathroom is now part of the kitchen, but the toilet soil pipe is still there....i was thinking of breaking the concrete around it so i could cut it down below the floor level, then block it up with concrete.....and then level off the floor with new concrete....is that ok to do ?...or whats the best way to do it ?..cheers