i am going to do a patio with 450 concrete flags. its at the bottom of a garden that needs levelling up about 150mm its 18 square meters so i need a lot of fill. whats the best way to do this?
I was thinking a tonne of MOT 1 to start with then the rest in ballast mixed at 6 to 1 with cement then sharp sand/cement for final bed for flags. am i along the right lines or is there a better way?
cheers Al
I was thinking a tonne of MOT 1 to start with then the rest in ballast mixed at 6 to 1 with cement then sharp sand/cement for final bed for flags. am i along the right lines or is there a better way?
cheers Al