• Looking for a smarter way to manage your heating this winter? We’ve been testing the new Aqara Radiator Thermostat W600 to see how quiet, accurate and easy it is to use around the home. Click here read our review.

Whats best

Status
Not open for further replies.
Joined
12 Apr 2005
Messages
5
Reaction score
0
Country
United Kingdom
My kitchen is an old extension which needs the existing concrete floor replacing. What would be best DPM on a bed of sand directly under the screed (40mm sand/cement semi dry) or a DPM coating applied in two coats on the surface of the screed.
Thank you
 
As I said on your other posting you need a minimum 50mm and preferably a75mm screed if it is un bonded to prevent cracking.


MOD

see item 1a
 

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Status
Not open for further replies.
Back
Top