got a new build house i'm doing the down stairs is fairly open plan i'm wiring the ring main from the floor. concrete sub floor then thick hard foam insulating with the silver foil on it then a inch of screed than a wooden floor!
my original plan was to run 20mm conduit on the sub floor and wire in singles. but i don't have room to get past the dpc so my new plan is to run it in high tuff. will that be allright? any advice on cable size? thanks fellas!
my original plan was to run 20mm conduit on the sub floor and wire in singles. but i don't have room to get past the dpc so my new plan is to run it in high tuff. will that be allright? any advice on cable size? thanks fellas!