How is a wind post installed? Got an engineer's spec that shows a windpost (100x8) embedded in the inner skin of a cavity wall. The buttress wall next to it is being removed, hence the need for the wind post.
Are the bricks removed, the windpost installed, and then the bricks/gaps filled? To fill the gaps/make good Is it standard masonry, or bricks and concrete, or something else?
Trying to get an idea of what's involved before taking it to the builder, so I know what extra activity/fee to expect.
Thanks,
Are the bricks removed, the windpost installed, and then the bricks/gaps filled? To fill the gaps/make good Is it standard masonry, or bricks and concrete, or something else?
Trying to get an idea of what's involved before taking it to the builder, so I know what extra activity/fee to expect.
Thanks,