Hi chaps, today I had to extend a circuit to provide a supply for a cooker extractor.
Don't want to go into why extending was the option
Anyway did a lovely crimp and double shrink job and capped over the T&E.
As the kitchen fitter is coming tomorrow I kindly slapped some plaster over the capping so that there would be a dryish finished wall.
Low and behold the moisture from the plaster has caused an earth fault tripping the RCD, matter of waiting for the drying to occur.
Anyway has anyone any experience of how long this process may take to clear???
Or should I go back, rip out the cable and put in 2 new legs??
Don't want to go into why extending was the option
Anyway did a lovely crimp and double shrink job and capped over the T&E.
As the kitchen fitter is coming tomorrow I kindly slapped some plaster over the capping so that there would be a dryish finished wall.
Low and behold the moisture from the plaster has caused an earth fault tripping the RCD, matter of waiting for the drying to occur.
Anyway has anyone any experience of how long this process may take to clear???
Or should I go back, rip out the cable and put in 2 new legs??