My builder having done a runner has left me in rather a pickle!
He has rendered below the DPC which he assured me was ok but having looked into I don't think is correct and neither does the BCO.
The first picture shows the original location of the DPC just above the engineering bricks.
I've laid decking all around the extension and most of it is now screwed down. What's the best thing to do to unbridge the DPC?
Thanks in advance
He has rendered below the DPC which he assured me was ok but having looked into I don't think is correct and neither does the BCO.
The first picture shows the original location of the DPC just above the engineering bricks.
I've laid decking all around the extension and most of it is now screwed down. What's the best thing to do to unbridge the DPC?
Thanks in advance