I am about to replace an electric shower (9Kw fed from RCB protected circuit and pull cord switch in bathroom) with a shower unit which has a "proccessor" requiring a 3A DP switched fused spur.
As the circuit for the existing shower will be redundant, and as that the "proccessor" for the new shower will be in the loft space. Is it OK to replace the pull switch from the existing circuit with a 3A fused switched spur.
This item will then be RCB protected and ceiling mounted, but in a bathroom.
As the circuit for the existing shower will be redundant, and as that the "proccessor" for the new shower will be in the loft space. Is it OK to replace the pull switch from the existing circuit with a 3A fused switched spur.
This item will then be RCB protected and ceiling mounted, but in a bathroom.