hi guys, ive got a builder coming that is going to board my ceiling and plaster my walls and he asked me to get the Kitchen Ring Main installed to 1st fix standard before he comes back (to keep cost and time down) and he told me that before he comes back to make sure the electrics are chased out the wall and "capped off" and 1st fix is done.
i dont do domestic electrics and never have, the training ive been given is just for the commercial testing i do on equipment..
i have no problem with the ring main side of it and zones and all of that, but having never done an apprenticeship or domestic training im unsure what capping i should use and how to do it?
the only videos ive been able to find online either suggest just clipping to the wall and bonding over.. or using round pipe conduit and then again bonding over them...
im on a limited budget so want the cheapest option but at the same time the work has to be done by the book or the builder wont do anymore of the work
i dont do domestic electrics and never have, the training ive been given is just for the commercial testing i do on equipment..
i have no problem with the ring main side of it and zones and all of that, but having never done an apprenticeship or domestic training im unsure what capping i should use and how to do it?
the only videos ive been able to find online either suggest just clipping to the wall and bonding over.. or using round pipe conduit and then again bonding over them...
im on a limited budget so want the cheapest option but at the same time the work has to be done by the book or the builder wont do anymore of the work