Hi,
I have read that the gas bonding needs to be within 600mm of the outlet of the gas meter and before the first T joint. My question is, what can happen if the bonding is after the first T joint? If there was a fault would the earth fault go and liven the the gas meter and incoming gas pipe, and is that the reason for it to be before the first T joint?
Thank you for any reply's.
I have read that the gas bonding needs to be within 600mm of the outlet of the gas meter and before the first T joint. My question is, what can happen if the bonding is after the first T joint? If there was a fault would the earth fault go and liven the the gas meter and incoming gas pipe, and is that the reason for it to be before the first T joint?
Thank you for any reply's.