I'm upgrading the controls on my old ch system to S-Plan. I will be running the new cables in .75mm heat resistant cable. Is the .75mm cable ok to run the power to the pump, or does it need something more heavy duty?
Thanks for any advice.
https://www.toolstation.com/shop/p74356?searchstr=heating cable
Thanks for any advice.
https://www.toolstation.com/shop/p74356?searchstr=heating cable
