- Joined
- 26 Aug 2016
- Messages
- 6,830
- Reaction score
- 1,009
- Country

You could but it still wouldn't comply with building regs. You might get away with all sorts, we had a waste pipe going up hill for a couple of years, and we just chucked drain cleaner down every few weeks when it ran slowly. But we fixed it as soon as we could, and we wouldn't design it that way even with a rodding pointWhat about if I asked him to install a rodding access point in the vertical pipe from the first floor, just above the first elbow?