When creating a new bathroom this is comes under building regs I believe. So a few questions-

The current bedroom internal timber stub with 12.5 pb and skim. One wall is adjacent to existing bedroom the other to landing and staircase. If this are not fibreglass filled would i have to remove pb and insulate these walls.

This is a three story town house with firedoors. All of the doors are to be replaced would the new ensuite door need to be a fire door.

Existing window is sash with clear glass would this need frosted glass - as in apply film to Existing.

LABC will be interested in svp and mechanical extraction- anything else?

Any advice appreciated

Thanks
 
Sponsored Links
Sound insulation is not required.
The door between the en suite and bedroom is not required to be fire resistant.
There is no B reg requirement for frosted glass
B regs are also interested in the drainage, but I assume this is to be connected to an existing SVP.
 
Unless fitting the doors yourself, with myriad different doors on site, be careful to make sure that the right door goes in the right place.
 
Sponsored Links
Depends if the OP wants to do a proper job or not.

Some people with low standards may accept stud walls resting only on the floor deck.
I have never heard of a single BCO who has ever taken this into consideration, even the most pedantically stupid one I worked with 20 years ago.
 
Im confused over the wall strengthening? Existing studs are 3x2 cls with 12.5 pb either side. How would any change to this make it a better job?
 
the room essentially won't change other than it will now have shower tray, wc an basin within it
 
Im confused over the wall strengthening? Existing studs are 3x2 cls with 12.5 pb either side. How would any change to this make it a better job?
No BCO has ever given it a thought, so forget about it.
 
I have never heard of a single BCO who has ever taken this into consideration, even the most pedantically stupid one I worked with 20 years ago.
Well it's on every single application that involves stud walls on timber floors around here, or it don't get approved.
 
Well it's on every single application that involves stud walls on timber floors around here, or it don't get approved.
Maybe on a new build, but no one ever asked for it any of the 4 authorities I've worked, or on a single guvvy job I've submitted and I've submitted a lot.
 
All of the stud work is existing. The only changes are the current door is from the landing, this will be filled in with stud and pb. And a new door from existing bedroom into what will now be shower room
 
All of the stud work is existing. The only changes are the current door is from the landing, this will be filled in with stud and pb. And a new door from existing bedroom into what will now be shower room
No need to worry then.
 
Maybe on a new build, but no one ever asked for it any of the 4 authorities I've worked, or on a single guvvy job I've submitted and I've submitted a lot.
Oh, its not required under BS site workmanship standards, NHBC or TRADA guides then?

Or is it just that those four authorities didn't bother?
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top