Hi all
Im having to redo my upstairs corner shower as the leak is showing on my downstairs ceiling every few months after removing old silicone and resealing.
The walls are plastic cladding and it cones down the the shower base and there is a gap in some sheets and it requires a lot of silicone to fill.
How can I resolve this?
Would removing it all again and resealing but this time using a piece of plastic’make up’ 1/4 circle quadrant in there as well ?
Or I could use a length of leftover panel going horizontally cornered with silicone to rear and topped piece white L angle PVC ?
Or I could go full out/bigger job and remove the whole cubicle and base and then silicone all the rear edge/ 2 sides of the base that touch the wall.
I think I should of done this when I fitted it??
Or do I do a mixture of above.
I have plenty of panels left over.
Cheers.
Im having to redo my upstairs corner shower as the leak is showing on my downstairs ceiling every few months after removing old silicone and resealing.
The walls are plastic cladding and it cones down the the shower base and there is a gap in some sheets and it requires a lot of silicone to fill.
How can I resolve this?
Would removing it all again and resealing but this time using a piece of plastic’make up’ 1/4 circle quadrant in there as well ?
Or I could use a length of leftover panel going horizontally cornered with silicone to rear and topped piece white L angle PVC ?
Or I could go full out/bigger job and remove the whole cubicle and base and then silicone all the rear edge/ 2 sides of the base that touch the wall.
I think I should of done this when I fitted it??
Or do I do a mixture of above.
I have plenty of panels left over.
Cheers.