Hi All,
We currently have a Danfoss TS975 programmer installed and the ‘boost 1hr’ for h/w doesn’t work, or has failed in the last month or so, which as a consequence the missus fiddles around with the program and causes chaos with the timings.
I was going to replace the unit and the SET 3E which on the face of it looks to be easier to operate, and less chance of chaos with the programming. Is this a straight swap over as in old off, and new on (with power off), or is it less straight forward?
Thanks in advance.
We currently have a Danfoss TS975 programmer installed and the ‘boost 1hr’ for h/w doesn’t work, or has failed in the last month or so, which as a consequence the missus fiddles around with the program and causes chaos with the timings.
I was going to replace the unit and the SET 3E which on the face of it looks to be easier to operate, and less chance of chaos with the programming. Is this a straight swap over as in old off, and new on (with power off), or is it less straight forward?
Thanks in advance.
