@opps it all depends on how much you have got to do. I always find that decorators bitch about the amount of work it take to hand sand 2-pack. They want the joiners to sand it out for them uf possible
Point taken. As a decorator, if I have to spend a couple of hours to sand back filler, after being told that the wood is ready to paint (and quoted accordingly), I too would be annoyed.
There are times where I have to sand profiled areas of two pack by hand, eg




The above was completely built up in layers of 2K and sanded using bits of sandpaper wrapped around metal profiles and various wooden dowels. Time consuming though. That was about 8 hours labour in total.

