I've to run a 110mm pipe approx 8m under my concrete subfloor.
Getting the fall etc correct is no problem but I'm wonder what the best way to backfill the channel is ?
I'm thinking DPC, then a bed of sharp sand then pea gravel.
Finished with a skim of cement (probably self leveling over the whole room ).
Any thoughts?
Thanks