Hi guys not posted in ages but I am finally getting close to finishing the roof structure on my two story extension and I am now thinking about tiling.
The house is rendered as will the extension. Am I right in thinking where the extension abuts the existing I don’t step the lead but create a continuous chase and then dress down over tiles.
I have four dorma’s that will also be rendered so it is the same or do I have to use stepped soakers ?
The house is rendered as will the extension. Am I right in thinking where the extension abuts the existing I don’t step the lead but create a continuous chase and then dress down over tiles.
I have four dorma’s that will also be rendered so it is the same or do I have to use stepped soakers ?