Search results

  1. S

    Airing cuboard built above bulkhead of stairs

    Hi All My airing cuboard is built on to landing above bulk head of my stairs it houses at minute a 114l cylinder which as been there 20yrs or more . the raised floor in there which is raised due to being the bulk of the stairs is showing signs of bowing . next week am due to have my heating...
  2. S

    new alarm panel and 2 new remote key pads with old pir's and

    prob not gunna bother with door contacts for decor reasons but will have a pir covering each door .
  3. S

    new alarm panel and 2 new remote key pads with old pir's and

    i'd say around 20yrs old . Would you reckomend changing the lot ? might be just a quick since i will be moving alarm panel to house a larger cylinder in airing cuboard . For a basic system with 2 remote pads 1 up 1 down , 1 bell box and 6 pir's what system would you go for ?
  4. S

    new alarm panel and 2 new remote key pads with old pir's and

    I need to upgrade/change my alarm panel and remote keypads as all buttons are sticking . will my old pir,s and bell box connect to my new panel ? i got a old pyronix system in at minute
  5. S

    all in 1 tester for sale

    +++++++ Advertising post removed. Mod Rupert +++++++
  6. S

    Tester on ebay for sale

    http://cgi.ebay.co.uk/KEWTECH-KT62-DIGITAL-LOOP-PSC-RCD-INS-CONT-TESTER-NEW_W0QQitemZ190091279130QQihZ009QQcategoryZ121877QQssPageNameZWDVWQQrdZ1QQcmdZViewItem thinking of buying that to get me registered with niceic how much u reckon it will go for?
  7. S

    submain testing.

    im in my 3rd session of 2391 and we aint covered allot of the maths so would appreciate if some1 could tell me the formula
  8. S

    submain testing.

    would this be done in the normal way as you do at main incoming supply i.e would you remove the incoming earth feed to the db ? and whille your on could to tell me the formular for calculating PFC at a db?
  9. S

    submain testing.

    is this the way everbodys does it ???
  10. S

    submain testing.

    When filling out a EIC i always use a seprate SCHEDULE OF TEST RESULTS for any submains feeding seprate CU. but what should i put for Ze and PFC at the top ?
  11. S

    calculating R1+R2

    whats the method used to calculate R1+R2 from r1 rn r2 readings on a ring final?
  12. S

    DIS course

    Hi mate i did the EAL domestic installers course a few months ago i did'nt really learn anything i didn't already know you will be much better off doing 2381 and the 2391 and skip the DIS course altogther
  13. S

    CSCS card and qualifications

    i sent them certs for 16th ed and EAL domestic installers course
  14. S

    CSCS card and qualifications

    I'm not saying i want electrcians grading but i would have like the qualification listed on the back of my card along with the 16th ed
  15. S

    CSCS card and qualifications

    anyone?
  16. S

    CSCS card and qualifications

    I got my cscs card in the post today ADULT TRAINEE i sent my certs off for my 16th ed and also EAL domestic installers course (17 units) but on the rear of the card it only state's 16th ed why is that? is the EAL course not recognized by JIB?
  17. S

    ECS card grading

    Hi all Just a question about ECS card i've been told by 1 of my contractors that i need to carry a ecs card whilst on site. Having only past 16th (2381) and EAL Domestic Installers course along with the ECS health and safety assesment. Im just wondering what grading they will give me...
  18. S

    testing at light fittings

    How do you lot go about testing loop tests at light fittings in from off niceic inspectors? with 3 leads plus a button to press wot do you lot do? Please take in mind i dont have a remote probe Tester is kewtech kt62
  19. S

    dno question

    how can he issue any certs without live tests?
  20. S

    SWA Cable RUn

    Get some blue and green/yellow sleeving. Use brown as live use grey as neutral sleeving with blue use black as earth sleeving with green/yellow
Back
Top