I had some pipework to run from the floor up into the wall for a towel rail during a recent barhroom renovation.
Iv got the pictured patch to fill in.
There is a gap on the right hand side. Am I better to remove and pack the back of the board or just use filler over a larger area?
There is quite a gap on the right hand side, but not the left which I think is due to being attached to seperate studs under the window.
If using a filler which I'd need to use anyway for screw holes and edges, would easyfill be an option to get it all flush or would I need to use multicoat? Trying to avoid a bigger job as the rest of the walls are sound.
Thanks all
Iv got the pictured patch to fill in.
There is a gap on the right hand side. Am I better to remove and pack the back of the board or just use filler over a larger area?
There is quite a gap on the right hand side, but not the left which I think is due to being attached to seperate studs under the window.
If using a filler which I'd need to use anyway for screw holes and edges, would easyfill be an option to get it all flush or would I need to use multicoat? Trying to avoid a bigger job as the rest of the walls are sound.
Thanks all
