Hi folks,
We have a new toilet waste coming down from the loft into the room below to connect to the existing 110mm waste. This will go pretty much across all of the brick wall in the room below to make the connection so we will be putting studwork on the whole wall to hide the new waste. As the waste is 110mm the studwork of course needs to be approx 120mm deep. So how do I go about attaching studwork this deep to the wall ?
Many thanks.
We have a new toilet waste coming down from the loft into the room below to connect to the existing 110mm waste. This will go pretty much across all of the brick wall in the room below to make the connection so we will be putting studwork on the whole wall to hide the new waste. As the waste is 110mm the studwork of course needs to be approx 120mm deep. So how do I go about attaching studwork this deep to the wall ?
Many thanks.