Hi everyone
In a slight dilemma, were cracking on with our build and I've installed all the hep20 pipework for the heating and cold water feeds.
Insulation is in and boarding has begun both sides. I've just done some research, admitted afterwards in hindsight should of done it beforehand, I've drilled 16mm holes using a spade for the pipes in all the stud walls, the pipe is 15mm. Does this mean now I have to remove all the insulation and plasterboard, pull all the pipes out and go round re-drilling all the holes, or will everything be ok?
Thanks
In a slight dilemma, were cracking on with our build and I've installed all the hep20 pipework for the heating and cold water feeds.
Insulation is in and boarding has begun both sides. I've just done some research, admitted afterwards in hindsight should of done it beforehand, I've drilled 16mm holes using a spade for the pipes in all the stud walls, the pipe is 15mm. Does this mean now I have to remove all the insulation and plasterboard, pull all the pipes out and go round re-drilling all the holes, or will everything be ok?
Thanks