Hi All
Could somebody give me a little bit of advice
I've been asked to contact EDF for pricing for installing a new power connection, but I'm not going to be able to speak to the electrical guy for the next 48 hours or so
I've been told to arrange a '400 amp (per phase) 3 phase supply'
They have come back this morning to say they cant proceed with pricing any further until I can give them a KVA value for what we need. Apparently the maximum from the 400A service is 277KVA
We will only be running 'single phase' equipment, balanced fairly evenly accross the phases. The total 'single phase' usage is approx 650 amps - this is just about 'flat' - no daytime peaks etc
My question is, what sort of KVA value should I go back to EDF with to get things moving along? This is just budgetary pricing they're providing at this stage do dont worry - I'm not ordering this (fairly substantial) service without confirmation from our electrical guy - I just need to go back to EDF to get things moving along at this early stage
Thanks in advance
Could somebody give me a little bit of advice
I've been asked to contact EDF for pricing for installing a new power connection, but I'm not going to be able to speak to the electrical guy for the next 48 hours or so
I've been told to arrange a '400 amp (per phase) 3 phase supply'
They have come back this morning to say they cant proceed with pricing any further until I can give them a KVA value for what we need. Apparently the maximum from the 400A service is 277KVA
We will only be running 'single phase' equipment, balanced fairly evenly accross the phases. The total 'single phase' usage is approx 650 amps - this is just about 'flat' - no daytime peaks etc
My question is, what sort of KVA value should I go back to EDF with to get things moving along? This is just budgetary pricing they're providing at this stage do dont worry - I'm not ordering this (fairly substantial) service without confirmation from our electrical guy - I just need to go back to EDF to get things moving along at this early stage
Thanks in advance