Hey all!
I am currently having a builder remove a load bearing wall and fitting an RSJ in place. However the RSJ they have put in is not level. Measuring from floor to RSJ, it is off by 5cm from left to right for a span of 3.5m.
Is this acceptable? They have also not fixed this as part of the plasterboarding so now we have a wonky beam going through the ceiling.
Please can you advise.
Thank you all in advance!
I am currently having a builder remove a load bearing wall and fitting an RSJ in place. However the RSJ they have put in is not level. Measuring from floor to RSJ, it is off by 5cm from left to right for a span of 3.5m.
Is this acceptable? They have also not fixed this as part of the plasterboarding so now we have a wonky beam going through the ceiling.
Please can you advise.
Thank you all in advance!