Hi All,
I need to add a Speedfit 15mm tee to an existing 15mm straight run of copper. Just wondering how much of the copper pipe do i need to take out to fit the tee? I am assuming one cut of the pipe won't work, i will need to take out a small section of the copper pipe to take into account the length of the tee?
Thanks
I need to add a Speedfit 15mm tee to an existing 15mm straight run of copper. Just wondering how much of the copper pipe do i need to take out to fit the tee? I am assuming one cut of the pipe won't work, i will need to take out a small section of the copper pipe to take into account the length of the tee?
Thanks