Hello all,
Currently have a 110mm waste pipe running horizontally under the floor from the loo, so the loo goes through the floor, to an elbow, then a fairly longish run to the stack.
Just after the 110mm elbow mentioned above, there is a strap on boss with a 1 1/4 waste which runs along and then up through the floor to a basin.
Can I add another strap on boss downstream of the above to run a 1 1/2 pipe for a bath?
Or will I have problems with gurgling and syponing?
Thanks in advance.
Currently have a 110mm waste pipe running horizontally under the floor from the loo, so the loo goes through the floor, to an elbow, then a fairly longish run to the stack.
Just after the 110mm elbow mentioned above, there is a strap on boss with a 1 1/4 waste which runs along and then up through the floor to a basin.
Can I add another strap on boss downstream of the above to run a 1 1/2 pipe for a bath?
Or will I have problems with gurgling and syponing?
Thanks in advance.